|
|
We I‚j‚r
It participates in
"Team minus 6%".
"STOP global warming"

IEƒŒƒ”ƒ…[
266 2010 Vol.51 No.3
‚ÉŒfÚ‚µ‚Ä‚¢‚½‚¾‚«‚Ü‚µ‚½
ˆÀ‘S‰q¶‚̂Ђë‚Î
2010.8‚ÉŒfÚ‚µ‚Ä‚¢‚½‚¾‚«‚Ü‚µ‚½
“ú–{ŒoÏV•·
2009.11.6‚TS‘«—˜ŠwZ‚ªŽn“®
Έä‹@ŠBƒI[ƒPƒXƒgƒ‰Hê
‚ÌŽæ‚è‘g‚Ý‚àЉ‚ê‚Ä‚¢‚Ü‚·

ŠeV•·ŽÐ‚Å‚àЉ‚ê‚Ü‚µ‚½B
HêŠÇ—@2009.4‘Ч†
‚É‚ÄЉ‚ê‚Ü‚µ‚½B
¢ƒI[ƒPƒXƒgƒ‰Hê‚Ì
ŽÀŒ»‚ð–ÚŽw‚·£

HêŠÇ—@2008.6‚Å
Љ‚ê‚Ü‚µ‚½B
‚ß‚´‚¹IuƒI[ƒPƒXƒgƒ‰Hêv

˜JŠî{•ñ@2007.4.15
@@@ ‚ÅЉ‚ê‚Ü‚µ‚½B
@ ¢‚TS‚ŕςí‚éHê£
HêŠÇ— 2005D12
@@ @‚ÅЉ‚ê‚Ü‚µ‚½B
@@¢‚TS‚à–{•¨ŽuŒü‚ւƕω»£
@@@
HêŠÇ— 2004D12
@@@¢‚TS‚à’·‚¢‚ÆŽR‚ ‚è’J‚ ‚è£
HêŠÇ— 2000D3
@@@¢”¼”N‚ňӎ¯‰üŠv‚È‚é£
|
| Ishii Machinery Co., LTD. |
@726 Fukutomi shinmachi, Ashikaga-shi, Tochigi-ken 326-0332 Japan
@TEL. 0284-71-4611 (main)
@FAX. 0284-72-882
@IP Phone. 050-3532-4807 |
|
|
| 2010.8 |
We installed the 5-axis fabrication
machine OKUMA MCR-A5C. |
| 2010.8 |
We werepublished ingIE Reviewhthat JIIE published |
| 2010.8 |
We werepublished in the plaza of the health and safety. |
|
2009.11
|
Ashikaga-5S-Gakkou@Kicked
offI |
|
2009.3
|
We installed the
‚r‚‚„‚‰‚ƒ‚‹@‚`‚p‚V‚T‚O‚k ‚o‚’‚…‚‚‰‚•‚. |
|
2009.2
|
English HP opened newly. |
|
2009.1
|
Our product was exhibited to the Sainokuni Business
Arena ! Thank you for coming to the Sainokuni Business Arena exhibit! |
|
2008.12
|
Awarded a JISQ9100 Aerospace Quality Management
System certificateô |
 |
 |
2010.8@We
committed to introduce the 5-axis fabrication machine
OKUMA MCR-A5C
Highly accurate processing of large-scale work and UP
of processing efficiencyô
|
 |
2009.11@Ashikaga-5S-Gakkou@Kicked
off !
To the town of the best 5S in the world.
|
 |
2009.3@We committed to introduce
the wire-cut EDM
‚r‚‚„‚‰‚ƒ‚‹@‚`‚p‚V‚T‚O‚k@‚o‚’‚…‚‚‰‚•‚ ô
It is possible to correspond also to work high hardness.
Large-scale wire cutting@ô
|
 |
Awarded a JISQ9100 Aerospace Quality Management System
certificate.
We aim for further quality-control and high-precision
manufacturing. We also aim to widen our appeal in the
field of aerospace!
|
 |
Thank you very much for your visit.
We showcased our work in the "SME exhibit IN TOKYO Big
sight" in November 2008!!
We exhibited a prototype of our Automatic floor washer,
which is still under development.
We decided to display this product-under-development
because we wanted to demonstrate a new product which highlights
our 5S activities!
|
 |
2008.11. We committed to introduce the Vertical machining
center KITAMURA Mycenter-4XiF.
High-precision, high-rigidity, and high-speed advanced
machining center. It provides stellar performance in the
field of aerospace-fabrication!!!
|
 |
2008. 2. Introduced 3D CAD CATIA V5, Solid works, MICRO
CADAM.
For the strengthening of our top-notch design department!
|
 |
2006, 12. Equipped the Horizontal Machining center with
a MAKINO A99E.
This is a double-sided pallet changer which operates
up to 12,000-rpm with an 800 pallet capacity.
|
 |
2006, 3. Equipped our 5-Axis Machining center with a
MAZAK VARIAXIS 730.
This is a 5-axis machine, with a double-sided pallet
changer, which operates up to 10,000-rpm, with a 500 pallet
capacity.
Along with this change, we have also installed 3DCAM-MASTERCAM.
STEP, parasolid, IGES and more data can be@worked on
in 5 axis'.
|
|
| |
- We have worked to enhance our quality control system in
accordance with our customers' needs, and have strengthened
our new facility.
- ›5-axis fabrication machine (OKUMA MCM) 5000~3000~700mm.
- ›Horizontal CNC Boring Machine (TOSHIBA MACHINERY BTD-110R16)
2000~1500~1450mm
- › 3D measuring machine (MITSUTOYO BR-V507) min. measurement
range: 0.0005mm,
accuracy: U3=(4+5L/1000)ƒÊm.
- › Linear Height (MITSUTOYO LH-600) measure stroke 0-972mm,
minimum increment amount: 0.0001mm, accuracy: U3(2+L/600)ƒÊm
- We completed a dust-free assembly area to meet the stringent requirements
of our semiconductor-related equipment.
- We achieved ISO9001 certification in 1997. At the same time,
we kicked off our "5S" program, which is aimed at further
improving our assembly quality.
- We began an innovative new product development project.
Each member of every department, from Procurement, CAD and
Manufacturing, through to Assembly and Setup, is actively
working to make this project a success.
|
|